PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed sprinkler branches at the 1st floor Facing West.jpg Installed temporary protection at the South Elevation.jpg Installing sprinkler pipes at the 1st floor Facing North.jpg Metal rack for the electrical equipment at the 2nd floor Facing West.jpg Welding cilps along the column at the 2nd floor North Elevation.jpg Continued constructing metal racks for the electrical equipment at the 4th floor.jpg Continued installing ductwork at the 2nd floor Facing East.jpg Installed steal beams at the 4th floor East Elevation.jpg Started excavating Boiler Room for the underground electrical roughing Facing South-East.jpg
Previous pageNext page Welding cilps along the column at the 2nd floor North Elevation
Welding cilps along the column at the 2nd floor North Elevation